
Commercial metallic floors
A showroom-grade decorative floor for spaces where customers form an opinion at the door.
The build-up, step by step
Every commercial metallic floors job Shanks installs follows the same order, because skipping a stage is how floors fail. Taylor is on site for all of it.
Prime for uniformity
A primed, uniform base so nothing underneath telegraphs through the metallic layer.
Base color
The solid base that sets the depth of the finished movement.
Metallic application
Poured and worked with squeegee and air. Large commercial areas are worked in sections with planned wet edges so there is no visible seam.
Commercial clear
A harder clear than a residential build, because this floor takes foot traffic all day.
Right room, right system
Retail floors, restaurants, salons, breweries, dealerships and reception areas.
Where it is the wrong call
Production and warehouse floors, where the clear will scar and a quartz or flake system is the better value.
Back in service: Foot traffic in 24 hours, full hardness at seven days.
Compare the other systems
Why this floor costs what it costs
Nobody can price a floor over the phone honestly, because two rooms of identical size can be a day apart in work. These are the things that actually move the number:
Size and shape
Bigger floors cost less per square foot, because the setup, the mixing and the cleanup are much the same whether the room is 400 or 1,400 square feet. Cut-up rooms with lots of edges take longer than open ones.
Which system you choose
Build thickness and the chemistry of the topcoat are the two biggest material costs. A heavier commercial build genuinely costs more than a residential one.
Access
A walk-out basement with a door at grade is straightforward. Carrying equipment down a flight of stairs, or working around a building that has to stay open, adds time.
Condition of the slab
A clean, sound slab grinds in a morning. One carrying old paint, carpet glue, or a failed coating can take a full day longer before anything can be applied.

What Alabama slabs do
Freeze-thaw cycling here is mild compared with the north, but it is real, and it is what turns a hairline crack in a porch or a garage apron into a spalled edge over a few winters. Cracks get filled before they are coated, not after.
Alabama humidity is the quiet variable in this work. Resin cures on a temperature and dew-point window, so a floor is scheduled around the weather rather than squeezed in before a storm rolls over Talladega.
Where the trailer goesWhat the days actually look like
The schedule matters as much as the finish when it is your garage or your shop. A normal run:
Planning the shutdown
The sequence is built around your operating hours first. Most commercial floors here are done in sections or overnight so the business keeps running.
Clearing and protection
Racking, stock and equipment move out of the working section, and adjacent areas are sheeted so dust and overspray stay put.
Prep and application
Grinding or shot blasting, repair, then the build. Each section gets handed back on a stated day, not a vague one.
Return to service
Foot traffic in about 24 hours, racking and vehicles at the full cure window for the system chosen.
Keeping it looking new
Dust mop it more than you would a chip floor, because a smooth gloss shows grit. Neutral cleaner only, and wipe spills rather than letting them dry. The clear is the sacrificial layer here: when it eventually dulls in the traffic path, it is scuffed and recoated and the metallic layer underneath is untouched.
Anything Taylor installs comes with a walk-through at handover covering exactly this, plus what to avoid in the first two weeks while the coating reaches full hardness. If something does go wrong later, tell him about it rather than living with it.
The owner is the installer
Shanks Concrete Coatings is Taylor and Heather Shanks, working out of Anniston. Taylor trained directly with Brian Phillips, The Epoxy Dude, in southern Indiana, and he runs the grinder and pulls the squeegee on every job himself. Licensed and insured, Alabama #2602341.
If a commercial metallic floors floor is not the right answer for your room, he will tell you that on the first visit rather than sell it to you. More about how Shanks works, or send over the details of your floor.
Commercial Metallic Floors questions
Can a big open floor be done without seams?
Yes, with enough hands and a planned wet edge. It is the main reason a large metallic floor takes more crew than a small one.
How does it hold up to chairs and carts?
The commercial clear handles normal traffic. Hard castors on a restaurant chair are the usual culprit, and felt or softer wheels solve it.
Can we match brand colors?
Closely, within the range metallic pigments allow. A sample board goes down in your space before the floor does.
Can it be refreshed later?
Yes, the clear can be scuffed and recoated without touching the metallic layer underneath.
How much disruption is it to a trading business?
Each area is closed for about three days. Restaurants and retail floors are usually done in sections across quiet periods, and the sequence is agreed before anything starts so nobody loses a weekend unexpectedly.
Four questions worth asking any installer
Ask these of Shanks and of whoever else you are talking to. The answers separate a floor that lasts from one that looks good for a season, and a straight installer will not mind being asked.
How are you preparing the slab?
The only acceptable answers involve a diamond grinder or a shot blaster. Acid etching and a scrub with degreaser is not preparation, and it is the single most common reason a coating lets go.
Are you testing for moisture?
On any basement or ground-level slab this should be a yes with a number attached. Vapor pressure will push a coating off no matter how good the product is.
Who is actually on my floor?
Worth asking whoever quotes you. With Shanks the person who quotes it is the person who grinds it and coats it, and that is not true everywhere.
What is the topcoat?
A UV-stable polyaspartic or aliphatic urethane holds its color. A cheap job leaves a standard epoxy as the top layer, and it will amber in daylight within a year or two.
Other systems for the same room
Commercial Metallic Floors is one of twenty-two systems Shanks installs. If the room is telling you something different, these are the closest alternatives, and Taylor will happily point you at the cheaper one if it is the right answer.

Commercial Epoxy
Another system Shanks installs across the same sixty-mile area.

Commercial Flake
Another system Shanks installs across the same sixty-mile area.
Commercial Polishing
Another system Shanks installs across the same sixty-mile area.
Novolac Epoxy
Another system Shanks installs across the same sixty-mile area.
Start with a look at the slab
Square footage, what the room is used for, and what the slab looks like now. That is enough to get you a real number on commercial metallic floors.