Commercial epoxy flooring
Floors specified for load, chemicals and cleaning schedules, installed around your operating hours.
The build-up, step by step
Every commercial epoxy flooring job Shanks installs follows the same order, because skipping a stage is how floors fail. Taylor is on site for all of it.
Survey
Loads, chemicals, cleaning regime, drainage and downtime window. The spec follows the use, not a catalog.
Prep
Grinding or shot blasting depending on size and existing coatings.
Build
Base, body and topcoat chosen for the actual exposure, coved to the wall and sloped to drains where the room needs washing down.
Line and detail
Traffic lines, bay markings and safety zones go in under the final clear so they cannot wear off.
Right room, right system
Warehouses, shops, production areas, showrooms and back-of-house rooms.
Where it is the wrong call
Nothing categorically, but the specification changes completely between a dry warehouse and a wet food-prep room.
Back in service: Return to service typically 24 to 72 hours depending on the system.
Compare the other systems
Why this floor costs what it costs
Nobody can price a floor over the phone honestly, because two rooms of identical size can be a day apart in work. These are the things that actually move the number:
Size and shape
Bigger floors cost less per square foot, because the setup, the mixing and the cleanup are much the same whether the room is 400 or 1,400 square feet. Cut-up rooms with lots of edges take longer than open ones.
Which system you choose
Build thickness and the chemistry of the topcoat are the two biggest material costs. A heavier commercial build genuinely costs more than a residential one.
Access
A walk-out basement with a door at grade is straightforward. Carrying equipment down a flight of stairs, or working around a building that has to stay open, adds time.
Condition of the slab
A clean, sound slab grinds in a morning. One carrying old paint, carpet glue, or a failed coating can take a full day longer before anything can be applied.

What Alabama slabs do
Newer construction around Trussville, Chelsea and Springville is usually a clean, flat pour that takes a coating beautifully, as long as the concrete has had its twenty-eight days. Coating green concrete is one of the few genuinely unfixable mistakes in this trade.
Alabama humidity is the quiet variable in this work. Resin cures on a temperature and dew-point window, so a floor is scheduled around the weather rather than squeezed in before a storm rolls over Talladega.
Where the trailer goesWhat the days actually look like
The schedule matters as much as the finish when it is your garage or your shop. A normal run:
Planning the shutdown
The sequence is built around your operating hours first. Most commercial floors here are done in sections or overnight so the business keeps running.
Clearing and protection
Racking, stock and equipment move out of the working section, and adjacent areas are sheeted so dust and overspray stay put.
Prep and application
Grinding or shot blasting, repair, then the build. Each section gets handed back on a stated day, not a vague one.
Return to service
Foot traffic in about 24 hours, racking and vehicles at the full cure window for the system chosen.
Keeping it looking new
Sweep and scrub with a neutral cleaner; a solid color shows dirt sooner than a chip floor, which is the trade-off for how bright it makes the room. Traffic lanes will show first, and a recoat in those lanes is a straightforward job that does not need the whole floor redone.
Anything Taylor installs comes with a walk-through at handover covering exactly this, plus what to avoid in the first two weeks while the coating reaches full hardness. If something does go wrong later, tell him about it rather than living with it.
The owner is the installer
Shanks Concrete Coatings is Taylor and Heather Shanks, working out of Anniston. Taylor trained directly with Brian Phillips, The Epoxy Dude, in southern Indiana, and he runs the grinder and pulls the squeegee on every job himself. Licensed and insured, Alabama #2602341.
If a commercial epoxy flooring floor is not the right answer for your room, he will tell you that on the first visit rather than sell it to you. More about how Shanks works, or send over the details of your floor.
Commercial Epoxy Flooring questions
Can you work nights or weekends?
Yes. Most commercial work is scheduled around production, and the sequence is planned so each area returns to service on a known day.
Will forklifts damage it?
Not a properly specified system. Hard wheels and point loads drive the choice of build thickness and topcoat hardness.
Do you handle line marking?
Yes, applied under the topcoat so traffic cannot wear the lines away.
What about a floor already coated?
It is tested for bond. Sound coatings can sometimes be overcoated; anything failing comes off.
Do you provide the documentation our insurer wants?
Yes. Product data sheets, moisture test results and the applied system spec are handed over on completion, which is normally what a manufacturer warranty or an insurer asks to see.
Can you phase it across several visits?
Yes, and most warehouses are done that way. The floor is divided into sections with planned joints at natural breaks, so operations continue in the areas not being worked on.
Four questions worth asking any installer
Ask these of Shanks and of whoever else you are talking to. The answers separate a floor that lasts from one that looks good for a season, and a straight installer will not mind being asked.
How are you preparing the slab?
The only acceptable answers involve a diamond grinder or a shot blaster. Acid etching and a scrub with degreaser is not preparation, and it is the single most common reason a coating lets go.
Are you testing for moisture?
On any basement or ground-level slab this should be a yes with a number attached. Vapor pressure will push a coating off no matter how good the product is.
Who is actually on my floor?
Worth asking whoever quotes you. With Shanks the person who quotes it is the person who grinds it and coats it, and that is not true everywhere.
What is the topcoat?
A UV-stable polyaspartic or aliphatic urethane holds its color. A cheap job leaves a standard epoxy as the top layer, and it will amber in daylight within a year or two.
Other systems for the same room
Commercial Epoxy Flooring is one of twenty-two systems Shanks installs. If the room is telling you something different, these are the closest alternatives, and Taylor will happily point you at the cheaper one if it is the right answer.

Commercial Flake
Another system Shanks installs across the same sixty-mile area.

Commercial Polishing
Another system Shanks installs across the same sixty-mile area.
Novolac Epoxy
Another system Shanks installs across the same sixty-mile area.
Get a real number on this floor
Square footage, what the room is used for, and what the slab looks like now. That is enough to get you a real number on commercial epoxy flooring.