Home About
Services All services Residential Garage Floor Epoxy Flake Epoxy Metallic Epoxy Garage Floors Garage Floor Restoration Non-Slip Epoxy Floor Residential Concrete Floor Polishing Polyurethane Floors Quartz System Self-Leveling Overlays Sleeper System Floor Outdoor Patio Coatings Terrace Restoration Waterproofing Commercial Commercial Epoxy Flooring Commercial Flake Epoxy Commercial Metallic Floors Commercial Floor Painting Commercial Concrete Floor Polishing Prep Concrete Grinding Concrete Sealing Concrete Floor Prep Chemical-Resistant Novolac Epoxy
Areas All areas
Blount County, AL All of Blount County, AL Oneonta, AL
Calhoun County, AL All of Calhoun County, AL Anniston, AL Jacksonville, AL Oxford, AL Piedmont, AL
Carroll County, GA All of Carroll County, GA Carrollton, GA Mount Zion, GA Villa Rica, GA
Cherokee County, AL All of Cherokee County, AL Centre, AL
Clay County, AL All of Clay County, AL Lineville, AL
Cleburne County, AL All of Cleburne County, AL Edwardsville, AL Heflin, AL
DeKalb County, AL All of DeKalb County, AL Fort Payne, AL Rainsville, AL
Etowah County, AL All of Etowah County, AL Boaz, AL Gadsden, AL Glencoe, AL Hokes Bluff, AL Rainbow City, AL Southside, AL
Floyd County, GA All of Floyd County, GA Rome, GA
Haralson County, GA All of Haralson County, GA Bremen, GA Tallapoosa, GA
Jefferson County, AL All of Jefferson County, AL Birmingham, AL Clay, AL Fultondale, AL Gardendale, AL Irondale, AL Leeds, AL Mountain Brook, AL Pinson, AL Trussville, AL Vestavia Hills, AL Warrior, AL
Marshall County, AL All of Marshall County, AL Albertville, AL Guntersville, AL
Polk County, GA All of Polk County, GA Cedartown, GA
Randolph County, AL All of Randolph County, AL Roanoke, AL
Shelby County, AL All of Shelby County, AL Chelsea, AL Columbiana, AL Harpersville, AL Pelham, AL Vincent, AL Westover, AL Wilsonville, AL
St. Clair County, AL All of St. Clair County, AL Argo, AL Ashville, AL Margaret, AL Moody, AL Odenville, AL Pell City, AL Ragland, AL Springville, AL
Talladega County, AL All of Talladega County, AL Childersburg, AL Lincoln, AL Sylacauga, AL Talladega, AL
Tallapoosa County, AL All of Tallapoosa County, AL Alexander City, AL Dadeville, AL Daviston, AL New Site, AL
Gallery Blog Contact
Call · (256) 365-6535
Skip to content
Grey flake pool deck wrapping a rectangular in-ground pool beside a brick house
Outdoor · Anniston, Alabama

Patio and porch coatings

Textured, UV-stable coatings for the concrete you actually sit on in an Alabama summer.

The build-up, step by step

Every patio coatings job Shanks installs follows the same order, because skipping a stage is how floors fail. Taylor is on site for all of it.

Clean and profile

Outdoor slabs carry mildew, efflorescence and old sealer. All of it comes off before anything is applied.

Repair

Freeze-thaw spalls and control joints get rebuilt so water is not sitting in them.

Textured build

A broadcast or knock-down texture that stays grippy in rain and does not get hot enough to burn bare feet.

UV topcoat

A color-stable topcoat, because everything outside here lives under direct sun.

Right room, right system

Back patios, front porches, breezeways, carports and pool surrounds.

Where it is the wrong call

Slabs that pond water. Standing water under any coating shortens its life, so drainage gets addressed first.

Back in service: Foot traffic next day, furniture at three days, full cure a week.

Compare the other systems
Speckled grey pool deck around a pool with blue loungers at the far edge

Why this floor costs what it costs

A quote on this work is really a quote on preparation. Here is what Taylor is looking at when he walks a floor:

Condition of the slab

A clean, sound slab grinds in a morning. One carrying old paint, carpet glue, or a failed coating can take a full day longer before anything can be applied.

How much repair it needs

Cracks, spalled edges, pitting and old anchor holes are filled and ground flush before coating. A slab that needs a lot of this can add a day on its own.

Access

A walk-out basement with a door at grade is straightforward. Carrying equipment down a flight of stairs, or working around a building that has to stay open, adds time.

Which system you choose

Build thickness and the chemistry of the topcoat are the two biggest material costs. A heavier commercial build genuinely costs more than a residential one.

Dark charcoal flake floor around an open floor hatch in a wide garage

What Alabama slabs do

Out toward Gadsden, Southside and Pell City there are a lot of walk-out basements cut into a hillside. Those slabs sit against earth on three sides, so they get moisture-tested before a quote rather than after a failure.

Most of the housing around Anniston, Oxford and Jacksonville was poured between the sixties and the eighties, and those slabs were hard-trowelled to a tight, closed surface. They look clean and they take a coating badly until they are properly ground, which is why a store-bought kit so often lets go here within a year.

Where the trailer goes

What the days actually look like

People are usually more anxious about the disruption than the floor. Here is what the days actually look like:

Watching the weather

Outdoor work runs on the forecast. Resin cures on a temperature and dew-point window, so a job gets moved rather than gambled when rain is coming.

Clearing the area

Furniture, planters and grills come off the slab. Anything that has been sitting in one place for years has usually left a mark that needs treating.

Prep day

Cleaning, grinding and crack repair. Outdoor slabs almost always need more repair than indoor ones because of what winter does to them.

Back in use

Foot traffic the next day, furniture back at about three days, and the full cure across the following week.

Keeping it looking new

Rinse it down a few times a year and keep leaves and standing water off it, especially in the corners where mildew starts. Reseal or recoat when the sheen starts going patchy, which outdoors is a matter of years rather than decades. Never use a pressure washer at close range on a coated slab.

Anything Taylor installs comes with a walk-through at handover covering exactly this, plus what to avoid in the first two weeks while the coating reaches full hardness. If something does go wrong later, tell him about it rather than living with it.

The owner is the installer

Shanks Concrete Coatings is Taylor and Heather Shanks, working out of Anniston. Taylor trained directly with Brian Phillips, The Epoxy Dude, in southern Indiana, and he runs the grinder and pulls the squeegee on every job himself. Licensed and insured, Alabama #2602341.

If a patio coatings floor is not the right answer for your room, he will tell you that on the first visit rather than sell it to you. More about how Shanks works, or send over the details of your floor.

Patio Coatings questions

Will it get too hot to walk on?

Lighter colors and a textured surface stay noticeably cooler than a dark, smooth coating. It matters most around a pool and it drives the color conversation.

What about our winters?

Freeze-thaw is exactly why prep matters here. Water in an unrepaired crack expands and lifts the coating off, so cracks are filled and the surface is sloped to shed.

Can it go over stamped concrete?

Yes. Stamped patios are often the best candidates because the pattern is intact but the color has washed out.

How long does it last outside?

With sound prep and a UV topcoat, many years. A recoat down the road refreshes it without starting over.

Can you match the coating to our house?

Colors and textures are picked on site, in daylight, against the brick or siding they will sit next to. A porch that reads well against red brick often looks wrong against gray board, and a sample board settles it before anything is mixed.

Four questions worth asking any installer

Ask these of Shanks and of whoever else you are talking to. The answers separate a floor that lasts from one that looks good for a season, and a straight installer will not mind being asked.

How are you preparing the slab?

The only acceptable answers involve a diamond grinder or a shot blaster. Acid etching and a scrub with degreaser is not preparation, and it is the single most common reason a coating lets go.

Are you testing for moisture?

On any basement or ground-level slab this should be a yes with a number attached. Vapor pressure will push a coating off no matter how good the product is.

Who is actually on my floor?

Worth asking whoever quotes you. With Shanks the person who quotes it is the person who grinds it and coats it, and that is not true everywhere.

What is the topcoat?

A UV-stable polyaspartic or aliphatic urethane holds its color. A cheap job leaves a standard epoxy as the top layer, and it will amber in daylight within a year or two.

Other systems for the same room

Patio Coatings is one of twenty-two systems Shanks installs. If the room is telling you something different, these are the closest alternatives, and Taylor will happily point you at the cheaper one if it is the right answer.

Deep brown stained and sealed floor running through an empty house toward patio doors

Concrete Sealing

Another system Shanks installs across the same sixty-mile area.

Wood-plank stamped concrete porch stained brown, running past stone columns

Waterproofing

Another system Shanks installs across the same sixty-mile area.

Terrace Restoration

Another system Shanks installs across the same sixty-mile area.

Tell Taylor about your floor

Square footage, what the room is used for, and what the slab looks like now. That is enough to get you a real number on patio coatings.